Green AI Campus

GPU capacity for enterprise AI

Plan compute for training, fine-tuning, production inference or batch processing. Compare capacity models, scope your deployment and prepare a brief for a technical discussion.

In development · capacity and activation dates subject to confirmation

Illustrative GPU server hall with liquid-cooling connections

Planned enterprise GPU services

Choose how to provision compute

A reservation secures an agreed block of capacity. A dedicated server allocates a machine to one customer. Inference hosting scopes a deployment around a model, and metered access is billed per GPU-hour.

Reserved GPU clusters

For recurring training runs, multi-node fine-tuning, or teams with a predictable capacity requirement.

Agree
GPU count, node layout, reservation period, and whether capacity needs to be available continuously.
Billing basis
Monthly reservation. Storage and network services may be priced separately.

Dedicated AI servers

For teams that need a server allocated to them, with access and configuration defined in the service order.

Agree
Server and GPU configuration, remote access, resources reserved for your team, and who manages the software stack.
Billing basis
Contracted server capacity and term, with any additional services itemised.

Inference hosting

For teams serving a model to an application, API or internal system that has measurable traffic and response requirements.

Agree
Model and runtime, traffic profile, throughput, response times, and responsibility for monitoring and incident response.
Billing basis
Capacity and hosting scope agreed for the deployment.

Metered GPU computing

For experiments, periodic batch jobs and workloads with uneven demand that can run in agreed windows.

Agree
Concurrent GPUs, expected runtime, acceptable scheduling window, and what counts towards billable usage.
Billing basis
GPU-hours at the agreed rate. Storage and transfer charges depend on the order.

Sizing and deployment

Define what your workload needs

The reference campus design uses 96 GPUs in liquid-cooled servers. The model, memory, interconnect, storage and networking are confirmed for each deployment during technical scoping.

Training and fine-tuning

Share the model and training method, framework version, dataset size, memory per GPU and target time to complete a run. For multi-node jobs, specify the smallest usable cluster and any interconnect or checkpoint requirements.

Online inference

Share the model, runtime, typical and peak traffic, and output size. Define your latency and throughput targets, including time to first token if relevant, and separate test traffic from expected production demand.

Batch processing and research

Share job size and frequency, runtime per job, deadline and maximum parallelism. Describe how jobs retry or resume and how much temporary storage the input, intermediate files and outputs need.

Estimate GPU-hour volume

One GPU running for one hour uses one GPU-hour. Eight GPUs running ten hours a day for five days use 400 GPU-hours. Count the GPUs needed at the same time and the hours each would run.

For a rolling workload, estimate ordinary and peak demand separately. Use the result to discuss capacity and usage assumptions with Link Labs.

What to confirm in the service order

Hardware and environment
GPU type and count, memory per GPU, CPU and RAM, single- or multi-node layout, benchmark or acceptance workload, OS, drivers, runtime and administration access.
Network and storage
Required bandwidth and connectivity, allowed ingress and exports, data volume, storage performance, backup scope and recovery requirements.
Location and data handling
Facility location, whether any data or backups may be stored elsewhere, access and logging requirements, incident reporting and any required data-processing agreement.
Timing and support
Target activation, reservation and renewal dates, acceptance procedure, maintenance windows, support hours, escalation priorities and response targets.

Contracting and onboarding

From initial scope to activation

A signed service order defines the capacity, term, price, technical boundaries and support. Activation follows resource preparation and technical checks.

  1. Scope the workload

    Confirm resource needs, start window and must-have requirements with the technical team.

  2. Agree the order

    Review the capacity, price, metering, deployment location, support and data-processing terms.

  3. Verify and activate

    Complete configuration and technical checks. Agree how and when material differences can be reported.

  4. Operate and review usage

    Review consumption or reservation invoices and use the agreed support and escalation channels.

Draft terms for a capacity discussion

Frequently asked questions

Before you request capacity

Workload brief

Prepare your GPU requirements

Download a text brief to share with your team or attach to your inquiry. The tool processes your inputs in your browser. Fill in the details you know and leave the rest for the scoping discussion.

Contact Link Labs

Discuss GPU capacity

Tell us what you’re running, how much compute you expect to need, and when. Attach your brief if you have one.