European AI infrastructure

Green AI
Campus.

A planned European data centre for training, fine-tuning and running AI models, with dedicated GPU capacity, liquid cooling and rooftop solar.

Reference configuration
96 GPUs
Indicative project budget
€10M
Proposed participation period
10 years
One project company per country
Europe

Enterprise compute

GPU capacity for different workloads

Compare four planned service models for training, inference, and intermittent work. The buyer’s guide covers technical requirements, billing, support and activation.

Capacity reservations

Reserved GPU clusters

Set aside a block of GPU capacity for recurring training runs or long-running AI programmes. Confirm the cluster size, reservation window and support requirements in the service order.

Dedicated resources

Dedicated AI servers

Allocate GPU servers to a single business customer. Define remote access, network configuration and storage needs before activation.

Model serving

Inference hosting

Host deployed models on contracted capacity. Size the deployment against throughput, latency, uptime and support requirements.

Usage-based capacity

Metered GPU computing

Use GPU-hours for intermittent work such as research, testing or batch processing. Agree the rates and any storage or network charges before use.

The project

From industrial site to AI computing campus

Green AI Campus is a proposal for a privately financed data centre. The project company would secure an industrial site, own the computing equipment and operate the facility for business customers.

The concept is designed to be developed independently in each country. Each deployment has its own company, funding, assets, customers and accounts.

In development · site and capacity subject to confirmation

Facility design

Inside the campus

The reference design combines compute, power, cooling and connectivity in one modular facility. Equipment and system sizing depend on the selected location and supplier proposals.

Illustrative aisle of server cabinets with blue equipment lights
GPU servers
The reference build plans for 96 GPUs in liquid-cooled servers. Hardware selection follows workload requirements, supplier quotes and site engineering.
Power and cooling
Grid supply remains essential. The design includes redundant power distribution, UPS backup, rooftop solar to supplement the grid, and a closed liquid loop that carries heat out of the server hall.
Fibre and storage
The plan includes fibre connectivity, protected networking and storage for enterprise workloads. Capacity depends on the deployment and customer requirements.
Physical operations
Controlled access, fire protection and facility monitoring are part of the design brief. Site due diligence covers power availability, permitted use and heat rejection.

Project model

How the campus is funded

Private project capital would fund the site, equipment and commissioning. Once in operation, the project company would earn revenue from reservations, dedicated servers, inference hosting and metered GPU use.

Indicative project budget

€10M

Reference allocation for one standalone facility. Site, equipment and suppliers will determine the final budget.

Planned allocation EUR

GPU computing systems
€5.10M
Property and fit-out
€1.15M
Electrical infrastructure and UPS
€0.95M
Cooling, fire protection and security
€0.60M
Rooftop solar
€0.35M
Storage, networking and fibre
€0.65M
Working capital and contingency
€1.20M

Project figures are for preliminary discussions. Commercial and financing terms require definitive agreements and location-specific review.

Development roadmap

What has to happen before launch

Green AI Campus is in development. The selected site will determine the grid connection, approvals, final equipment and commissioning schedule.

  1. Qualify the site

    Check grid capacity, fibre, permitted use, and options for cooling and heat rejection.

  2. Validate demand and procurement

    Gather customer requirements and supplier quotes to inform the configuration and budget.

  3. Close project financing

    Document the funding terms and put project reporting and operating controls in place.

  4. Fit out and equip the facility

    Secure the property and install the power, cooling, network and GPU systems.

  5. Commission and activate

    Test the facility and activate capacity under signed customer service orders.